This is my project. Started the footings on Friday should be pouring them today, if the weather holds. That far right corner, 20x20 reloading room, will have a 2 o x 4 o window with bars just inside the corner to the left with an overhang for dry in the rain. Building will be 1800 sq ft with heat and air. The 200 meter range is to the rear with a 15 ft high berm in the distance. Put 6,700 pounds of lime on the range two years ago. If you look close there is a berm at 100 yards right at the top of the batter board post on the range, all the way across.
Wish your place was closer, I have a 4x4 tractor with a front end loader with a fair sized bucket and a back hoe. Could drop by for a few minutes and get your berms piled up for you.:thumb:
Ed
Thanks Ed, looks like that will be one fine setup! Sure is a lot of work isn't it. I also have a reloading room and my long end of the range where I need the dirt moved is 175 yds. Good luck with your project! Mark