Picked up some warehouse shelving and started on one 4X8 Table...Shit Brickhouse right there. Put the bottom shelf on the ground to keep stuff from rolling under. Bottom shelf will be lipped in case equipment vibrates something.
Living in Florida, and having seen record flooding over the last few years in several Southern States...
have you considered putting that unit UP a little higher??
Looks like you've got enough loose cable to boost it up a few feet and keep it out of Harm's Way
we had a pretty major flood here in '94...100 year type I think...and I was good then. It was when Hurricane Alberto stalled just north of us and dropped a bunch of rain on already saturated ground....I might not care in 2094 https://en.wikipedia.org/wiki/Tropical_Storm_Alberto_(1994)
Got a little more completed. Back left 6' table will house the MEC and Dillon Loaders, my component rack also 6'...bullets on the top shelf...powder on the 2nd and maybe onto the 3rd...bottom for brass storage. Not sure if my tool box will stay there or the library will go there. Got the 4X8 work table completed...drill press..swagger..chop saw for 300BLK...sander...stuff like that on there. Storage underneath I think will be table saw, miter saw, and other items like that.
you can see part of the top leaning against the wall where my single stage stuff will be.
One step closer this afternoon. Had to move tool box for room constraints...put the Library there since it isn't so deep. That way when I install the bank under counter on the left end of larger than O originally though I would make (by 18") I can still get into the corner. The loading table ended up being 8'LX32"D and a finished height of 37". I will have to notch the 2X6 on the left side so the tool box will slide under and hope I left room under there for the fridge too. Right side will have a shelf/footrest maybe...things keep spinning about what is going where. There are shelves and additional cabinets in this somewhere too. I just might have to throw something away :wacko:
I owe, I owe so off to work I go...maybe I will finish the loading bench after work this week.
Moved and shelved bullets, primers, and powder today before I went to the WMA Range close by.
Finished shelving up when I got back...looks like I will get to do powder 1 more time...found 5 more 8s and 4 1# in another spot.
Primers are in the gray cabinet to the left of the loading bench.
hope I can get these on the next shelf down and still get brass on it.