I have mentioned building a reloading room and have posted a couple of pictures and thought I would share some more. This project has taken me a little over a year working on the weekends when time was available. I think I am beginning to see the light at the end of the tunnel.
Had the slab poured and stood up the walls.
Set the trusses and put the sheeting on.
Wrapped it and put on a metal roof.
Showed the picks with the LED lights installed and interior almost complete. I need to install the attic insulation, the A/C, and a few finishing touches. Then I can start on the work areas.
I started putting the siding up this weekend and that seems to be going well. Got the back wall finished and started on one of the gable ends.
Had the slab poured and stood up the walls.
Set the trusses and put the sheeting on.
Wrapped it and put on a metal roof.
Showed the picks with the LED lights installed and interior almost complete. I need to install the attic insulation, the A/C, and a few finishing touches. Then I can start on the work areas.
I started putting the siding up this weekend and that seems to be going well. Got the back wall finished and started on one of the gable ends.